Tigercub
Catalog
TIGER
CUB - ES-300-MB
SPECIFICATION
FOR TIGERCUB ES-3000-MB
SIMPLEX
CLOSE-COUPLED
END SUCTION DOMESTIC
WATER BOOSTER
SYSTEM
Furnish
and install a TIGERFLOW Series
ES-3000-MB TIGERCUB Model
STC ____ (HP) >>>> (Pump
Model) ____ (tank) Simplex,
U.L./C-U.L. listed, engineered
packaged domestic water Booster
System. The system shall
be rated for a system flow
of ____ GPM at a system pressure
of ____ PSIG, including a
suction pressure of ____ PSIG
minimum, ____ PSIG maximum.
PUMP(S) & MOTOR(S)
Pump(s)
shall be __________,
series ______,
Cast Iron, Bronze
Fitted, Mechanical
Seal, End Suction
centrifugal type
each close-coupled
to a ______ RPM,
_____ Voltage,
____ Phase, 60
Hz, high efficiency
motor.
Conditions
of Service: _____GPM
at _____’ TDH,
_____HP
VALVES
(1)
2” angle
pattern, fused epoxy coated,
combination pressure regulating
and check valve, complete
with stainless steel internals,
stainless steel cover bolting,
and stainless steel
flex connector piloting. (option)
(1)
2” non-slam,
center guided, globe pattern,
check valve
(2)
2” full-port
isolation full-port ball valves
(option)
OVER-TEMPERATURE
PROTECTION
Pump shall be equipped
with an individual
combination type
non-electric temperature
probe and purge
assembly
with PRV on Purge
line
GAUGES
(2)
2-1/2” diameter,
stainless steel case, liquid
filled pressure gauges
complete with shut-off cocks
(option)
U.L. LISTED POWER
AND CONTROL PANEL
(1) U.L. Listed,
Nema 4, Power and
Control Panel
(*)
U.L./C-U.L. 508
Label
-Pressure
sequencing with
(1) Mercoid DA Series
pressure switch
with minimum run
timer
-Individual
pump run indicator
-H-O-A
Selectors
-Low
Suction Alarm with
light (1) pressure
switch with time
delay relay
(1)
FVNR magnetic starter
with 3-leg overload
protection
(1)
120/1/60 control
circuit transformer
(1)
Thru-door disconnect
with individual
motor circuit protection
(option)
TANK
(1) Model ST-12,
4.4 gallon, 150#
non-code, FDA bladder
tank skid mounted
(1) Model ST-210V,
86 gallon, 150#
non-code FDA bladder
tank (adjacent mounted)
(option)
FACTORY PREFABRICATION:
(1
set) 2” Schedule
40 galvanized steel suction
and discharge piping.
(*) Steel system
skid with all necessary
pipe supports, tubing,
and wiring for complete
package.
(*) Unit to be
factory primed`
and painted with
machine grade finish
coat.
(*) All welding
shall be done by
ASME Section 9 certified
welders.
THIRD PARTY TESTING,
OSHA REQUIREMENT
The package shall
be UL Listed as
a system for its
intended use, so
meeting OSHA Federal
Regulations 29 CFR
1910.303
and 399 as well
as NFPA Pamphlet
#70 (National Electric
Code) Article 90-7,
City of Los Angeles
Approval Code, CMR248
Massachusetts State
Plumbing Code Approval.
FACTORY TEST
The package shall
be electrically
and hydrostatically
tested before shipment,
in addition, each
system shall be
factory tested from
0-100% of flow and
pressure.
STARTUP
The factory authorized
local representative
shall provide (2)
hours of startup
and field training.

WARRANTY
Each TIGERFLOW
system shall be
warranted for a
period of (18) months
from date of shipment
or (12) months from
date of startup,
whichever occurs
first.
SUBMITTALS & INSURANCE
CERTIFICATIONS
Submittals shall
be in accordance
with requirements
of general specifications.
Submit 6 copies
to the engineer
for approval. All
submittals must
include the following:
-
Complete
shop drawings and complete
wiring diagrams. All drawings
must be AUTOCADD Release 2000;
complete with full mechanical
Desk Top 3-D drawings in both
hardcopy and disk format.
Complete operating and maintenance
instructions.
-
Furnish
written certification of the
manufacturers
listing with Underwriters Laboratories
as an approved manufacturer
of control panels.
-
Furnish
written certification that
the manufacturer is listed
by UL/C-UL as an approved manufacturer
of factory assembled pumping
systems.
- A
complete,
easily readable functional
description
of the proposed equipment.
-
Upon
completion of the installation,
the results of the field
and acceptance
tests as specified under this
section of the specification
shall be submitted to the engineer.
-
Furnished
written certification from
the manufacturers representative
of
the proper installation of
the station.
-
Provide
written certification that,
a nationally recognized manufacturer
of package pump systems, manufactures
the pump system. A corporate
officer
must sign this certification.
-
Operation
and maintenance manuals:
Submit
complete operations
and maintenance
information for
this specific equipment.
The engineer shall
review these manuals
for completeness.
They shall include
complete parts list
including manufacturers
reference and ordering
number, the local
representative name,
address and phone
number, the model
and serial number
of the system.
-
The
manufacturers
shall submit a certificate
of product liability insurance
for no less than one million
dollars ($1,000,000)
QUALITY ASSURANCE
-
All
equipment under this section
shall be furnished by a single
supplier and shall be products
that the manufacturer regularly
engages in. The supplier
shall have sole responsibility
for proper functioning
of the system and equipment
supplied.
-
Equipment
shall be a manufacturer’s
standard product
presently in commercial
production.
-
The
manufacturer
shall have in place a quality
assurance program to assure
the quality of the material
furnished.
QUALIFICATIONS
-
The
manufacturer shall have a minimum
of ten years manufacturing
and application experience.
-
Upon request
from the engineer, the pump station
manufacturer shall demonstrate
proof of financial responsibility
with respect to performance and
delivery date.
-
Upon request
from the engineer, the pump station
manufacturer shall provide proof
or evidence of facilities,
equipment and skills required
to produce the equipment specified
herein
|